プロジェクト・スケジュールの品質特性の数値化に関する研究
http://hdl.handle.net/10458/00010281
http://hdl.handle.net/10458/000102815471b07d-e52b-4504-a097-19029b0de81b
名前 / ファイル | ライセンス | アクション |
---|---|---|
![]() |
|
Item type | 紀要論文 / Departmental Bulletin Paper(1) | |||||
---|---|---|---|---|---|---|
公開日 | 2021-11-02 | |||||
タイトル | ||||||
タイトル | プロジェクト・スケジュールの品質特性の数値化に関する研究 | |||||
言語 | ja | |||||
タイトル | ||||||
タイトル | Study on Quantification of Quality Characteristics of Project Schedules | |||||
言語 | en | |||||
言語 | ||||||
言語 | jpn | |||||
キーワード | ||||||
言語 | en | |||||
主題Scheme | Other | |||||
主題 | Project schedule management | |||||
キーワード | ||||||
言語 | en | |||||
主題Scheme | Other | |||||
主題 | Delay risk tolerance | |||||
キーワード | ||||||
言語 | en | |||||
主題Scheme | Other | |||||
主題 | Delay risk | |||||
キーワード | ||||||
言語 | en | |||||
主題Scheme | Other | |||||
主題 | QCD | |||||
資源タイプ | ||||||
資源タイプ識別子 | http://purl.org/coar/resource_type/c_6501 | |||||
資源タイプ | departmental bulletin paper | |||||
著者 |
池田, 良磨
× 池田, 良磨× 今村, 和樹× 高塚, 佳代子× 岡崎, 直宣× 山場, 久昭× 油田, 健太郎× 池田, 良磨× 今村, 和樹 |
|||||
抄録 | ||||||
内容記述タイプ | Abstract | |||||
内容記述 | In the manufacture of products, we are required to meet three requirements, they are QCD (Quality and Cost, Delivery date). And QCD are required in the project management. However, in the present circumstances, it’s just a rough evaluation of the project schedule at delivery date and cost. In recent years, large-scale and complicated projects have become difficult to evaluate even in terms of using delivery date and cost. So, we need a rational method for quantifying the risk of overdue delivery (delay risk). At present, the evaluation of delay risk can only be left to the experience and intuition of administrators because there is no rational method to expose the risk of delay at the work level. Therefore, our laboratory introduced the concept of “delay risk tolerance”. It is difficult to quantification of delay risk, but it is easy to quantification of “delay risk tolerance”. And we proposed a method to evaluate delay risk based of the magnitude of “delay risk tolerance”and convert it into cost. In the evaluation experiment, the validity of this method was verified with a simple example that imitated a certain project. Next, as a case study, we applied this method to four types of realistic project schedules and verified their usefulness. Through a case study, we showed the validity and commonality of this method. | |||||
言語 | en | |||||
書誌情報 |
ja : 宮崎大学工学部紀要 en : Memoirs of Faculty of Engineering, University of Miyazaki 巻 50, p. 137-141, 発行日 2021-09-28 |
|||||
出版者 | ||||||
出版者 | 宮崎大学工学部 | |||||
言語 | ja | |||||
出版者 | ||||||
出版者 | Faculty of Engineering, University of Miyazaki | |||||
言語 | en | |||||
ISSN | ||||||
収録物識別子タイプ | ISSN | |||||
収録物識別子 | 05404924 | |||||
書誌レコードID | ||||||
収録物識別子タイプ | NCID | |||||
収録物識別子 | AA00732558 | |||||
著者版フラグ | ||||||
出版タイプ | VoR | |||||
出版タイプResource | http://purl.org/coar/version/c_970fb48d4fbd8a85 |