ログイン
言語:

WEKO3

  • トップ
  • ランキング
To

Field does not validate



インデックスリンク

インデックスツリー

  • RootNode

メールアドレスを入力してください。

WEKO

One fine body…

WEKO

One fine body…

アイテム

There is a newer version of this record available.
  1. 教育学部・大学院教育学研究科
  2. その他 (教育学部)
  3. 6th International Conference on INTERNATIONAL CONFERENCE ON SCIENCE, TECHNOLOGY AND EDUCATION ICSTE 2020

The Process Improvement in the Production Line of Automobile and Motorcycle Electrical Wire Assembly

http://hdl.handle.net/10458/00010052
http://hdl.handle.net/10458/00010052
a930f14a-d3ad-4092-8ed8-5ec6f815fb5e
名前 / ファイル ライセンス アクション
ICSTE2020_p95.pdf The Process Improvement in the Production Line of Automobile and Motorcycle Electrical Wire Assembly (709.6 kB)
Item type その他 / Others(1)
公開日 2020-10-28
タイトル
タイトル The Process Improvement in the Production Line of Automobile and Motorcycle Electrical Wire Assembly
言語 en
言語
言語 eng
キーワード
言語 en
主題Scheme Other
主題 Process improvement
キーワード
言語 en
主題Scheme Other
主題 process
キーワード
言語 en
主題Scheme Other
主題 Automotive parts accessories
資源タイプ
資源タイプ識別子 http://purl.org/coar/resource_type/c_1843
資源タイプ other
著者 Maneepen, T.

× Maneepen, T.

WEKO 32918

en Maneepen, T.

Search repository
Kaewkuekool, S.

× Kaewkuekool, S.

WEKO 32919

en Kaewkuekool, S.

Search repository
Thongchuea, P.

× Thongchuea, P.

WEKO 32920

en Thongchuea, P.

Search repository
Lueamnat, P.

× Lueamnat, P.

WEKO 32921

en Lueamnat, P.

Search repository
抄録
内容記述タイプ Abstract
内容記述 The objective of this project is to study the problems of the production of automotive and motorcycle electrical wiring harnesses in order to improve the production process to be more efficient. The results from studying indicated many problems that were some procedure, which was not finished in time, so it could not absolutely satisfy for customer demand to solve the problem by using 7 principles of qualitative instrument, ECRS. These problems could be fixed by rearranging procedure of procession and setting seating chart of employees. The overall operation was found that every process was controlled by customer requirement, which was 14.4 seconds could totally reduce the time from 115.3 seconds/piece to 104.7 seconds/piece accounting for 9.19% increased production efficiency from 84.77% to 91.52%.
言語 en
書誌情報 en : International Conference on Science, Technology and Education 2020 (ICSTE 2020)

p. 95-99, 発行日 2020-09
著者版フラグ
出版タイプ VoR
出版タイプResource http://purl.org/coar/version/c_970fb48d4fbd8a85
戻る
0
views
See details
Views

Versions

Ver.2 2023-07-30 04:51:48.020157
Ver.1 2023-05-15 12:06:00.332366
Show All versions

Share

Mendeley Twitter Facebook Print Addthis

Cite as

エクスポート

OAI-PMH
  • OAI-PMH JPCOAR 2.0
  • OAI-PMH JPCOAR 1.0
  • OAI-PMH DublinCore
  • OAI-PMH DDI
Other Formats
  • JSON
  • BIBTEX

Confirm


Powered by WEKO3


Powered by WEKO3